Communicating as a team

A project tool, not just "getting on well"

Communicating as a team

Set up regular sync meetings and make sure that what is decided out loud ends up in writing, to avoid silent blockers.

Documentation completed: 70% 70
Created by:  Adrien Bracq

A tool, not a human quality

Communicating well as a team is not a matter of getting on well: a team that gets on very well can still work in silos because nobody takes the time to say where they are at. It is a set of concrete practices to put in place, like any other project tool.

Regular, short sync meetings

A 15-minute team meeting every week, with a simple format, is better than a two-hour meeting once a month:

  • What have I done since last time?
  • What is blocking me, if anything?
  • What am I doing next?

Communicating the blocker: “it’s not going too well on the motor part.”

What is missing: nobody knows whether to worry, help, or wait. The blocker drags on for another week before someone really understands the problem.

Communicating the blocker: “The stepper motor does not turn, and the A4988 driver gets abnormally hot after 10 seconds. I have checked the wiring twice; it may come from the current setting. I need an opinion tomorrow morning before going on.”

What this allows: anyone in the team (or the supervisor) can help immediately, or at least know that it is serious.

What is decided out loud must end up in writing

A decision taken in a meeting and never noted down no longer exists as soon as someone forgets it or remembers it differently. The reflex: at the end of each sync meeting, one person notes in 2-3 lines what was decided, in the logbook: it is a direct application of documenting as you go.

  No need for formal minutes

2-3 lines are enough: who decided what, and why. The aim is for someone who missed the meeting to understand the decision in 30 seconds, not to produce official minutes.

Communicating with the outside

The academic supervisor, the jury, or anyone outside the project must be able to understand where you are at without rereading the whole history. Two useful reflexes:

  • Check in regularly with the supervisor, not only at the final submission: it lets you correct course early if something drifts away from the need.
  • Be able to sum up the state of the project in 30 seconds at any time: where you are at, what works, what is blocked.

Exercise

As a team, now:

  1. Set a recurring day and time for your weekly sync meeting. Note it somewhere the whole team can see it.
  2. At the end of your next meeting, decide who notes the decisions in the logbook, and actually do it, not “we’ll remember”.