What is assessed
The course is assessed in two parts: what you show during the labs, including the design and soldering of the board, and the project carried out in pairs.
| Part |
Weight |
What we look at |
| Labs |
30 % |
The checkpoints of each lab, validated during the session by the instructor, including the two validations of the board |
| Project |
70 % |
The game, the browser player, the code, the repo and the demonstration |
The project mark is a pair mark: both members get the same one. This is why each of you must be able to explain the whole project, including the part you did not code yourself.
The labs (30 %)
Each lab ends with checkpoints, which the instructor validates during the session, on your setup or your board:
| Lab |
Weight |
What must work |
| Lab 1 |
5 % |
The XIAO’s LED blinks; the serial monitor displays the board’s messages |
| Lab 2 |
5 % |
The four modules of the kit work on a breadboard: a single message per button press, calibrated joystick (0 at rest, -1 / +1 at the end stops), buzzer that sounds, display that shows something; the test program brings the four together |
| Lab 3 |
10 % |
The board’s schematic passes validation 1 and the routing validation 2; the design choices (protection of D6, I2C pull-ups, LED, decoupling) are justified in writing |
| Lab 4 |
10 % |
The final board is neatly soldered and passes all the tests; the Pong can be played on it from the welcome screen to the end of the game, without reflashing |
A checkpoint not validated during the session can be validated at the start of the next one. The board validations must be obtained before Lab 4.
The project (70 %)
| Criterion |
Weight |
What must show |
| The game on the console |
25 % |
Requirements C1 to C8 of the brief met during the demonstration |
| The browser player |
25 % |
Requirements N1 to N7; the originality of the role, the balance between the two players, the real value of the interaction |
| The code and its robustness |
10 % |
Modules, state machine, no delay() in the loop; disconnections and invalid messages handled, games played back to back without restarting the board |
| The repo and the demonstration |
10 % |
Complete documentation (firmware, protocol, tests, logbook), smooth demonstration, clear answers to questions |
The demonstration is done with what works, not with what will work. Keep a stable version (a tag) and rehearse the demonstration before the big day, including a browser disconnection.
The repo on the submission date
The project is assessed on the state of your repo on the submission date given at the start of the project, and on the demonstration. Everything in the repo on that date counts, history included: regular commits show steady work.
The expected content of each part is detailed in the Project Methodology course:
Before the submission date, go through the project closing checklist with your partner.